Assignment Three (Online Edition)
In this lab you will write instructions which will include at least 1 drawing on how to properly build a standard UTP patch cable. Ideally your instructions should be a step by step sequence that starts with the materials required and ends with a finished cable.
You can download this standard patch cable wiring diagram. You will use this information to create a patch (straight through) cable that can be used in the lab
Your instructions should include:
  • The materials required to perform the task by proper industry names -- this includes any tools which will be needed
  • A wiring diagram showing wire colors for each wire and how each wire gets connected to the pins in both connectors
  • Step-by-Step instructions which include how to prepare the wire to be inserted into the connectors

Assignment Submission Criteria
To turn in this assignment you will go to the NSC Canvas shell for this class. Submit your finished document to me as an attachment